A.) Dome and DZC have carried out the following projects.
Project Scope of Work Client Country Year
Execution of Tunnel Pumping Station PS-01 Strategic Tunnel Enhancement Programme E&I Precommissioning Support

i. Electrical Testing at main substation
ii. Vendor Support for equipment testing
Bechtel/Petrofac Abu Dhabi, UAE 2017 (on going)
Execution of Tunnel Pumping Station PS-01 Strategic Tunnel Enhancement Programme Electrical & Instrumentation Works
i. Installation of Conduits & cable trays
ii. Cable Pulling in conduits & trays as per design drawings
iii. Installation of CP cables from Anodes, reference electrodes negative test connection, positive and negative headers, location to JB's and CP Transformer for PS 01 shaft and Flow distribution chambers per project drawing
iv. Services of Electrical Engineer/ Auto Draftsmen for shop drawing for bill of material for cable and CP rectifiers Installation.
Corpro Companies International Abu Dhabi, UAE 2017 (on going)
Al Taweelah Alumina Package 25875-070-HC2-E00X-00034 (Electrical & Instrumentation Installation - Area 2 White Side (E&I-2)) E&I Electrical and Instrumentation Installation Works
i. Electrical Installation works
ii. Instrumentation Installation works
iii. Supply and Installation of Fire Detection System
Iv. Supply of Bulk Materials & consumables
V. Construction Engineering Works
Becthel/Petropaf JV Abu Dhabi, UAE 2016 (on going)
ASAB FLARE MODIFICATION PROJECT CME&I Works
i. Electrical Installation works
ii. Instrumentation Installation works
iii. Civil Works
iV. Piping Works
V. Mechanical Works
VI. Supply of Bulk Materials and Consumables
VII. Construction Engineering Works
Petrofac Abu Dhabi, UAE 2016 (on going)
CARBON BLACK DELAYED COKER PROJECT E&I Works
i.Installation of Power Transformers
ii.Installation of MV & LV Switchgear
iii.Installation of UPS, battery Charger and Batteries
iv.Installation of LV Bus Duct
V.Installation of power, control and Earthing cables.
vi. Lighting and Instrument cable Trays
vii.Fabrication and installation of cable Tray supports
viii.Installation of Transmitters, Gauges, Valves, DCS, PLC etc.
Samsung Abu Dhabi, UAE 2014 (on going)
Electrical Heat Tracing and Sect Electrical Works-(Sub No. CBDC-E&I-SC-004 Heat Tracing Works
Heat Tracing Installation works and Electrical Works
Samsung Abu Dhabi, UAE 2015 (on going)
ASAB FFDP E&I Technical Support for instrument modification CDS/ RDS Petrofac Abu Dhabi, UAE 2014 (on going)
E&I Maintenance Assistance for Offshore Platform E&I Works
i.Maintenance of Electrical and Instrumentation services for TOTAL ABK Offshore Platform.
TOTAL ABK Abu Dhabi, UAE 2014
Al Uqlah Oil CPF Construction

Yemen Construction of 30,000 Barrel Central Processing Facility (CPF) for OMV
E&I Works
i.Installation,Testing and Pre Commissioning of LV switchgear,MV Switchgear, Transformers,UPS,Lighting Distribution Boards etc
ii.Laying,testing, Pre Commissioning and Termination of MV, LV , Control and Earthing cables.
iii.Installation, Testing and Pre Commissioning of Field instruments like Transmitters,Indicaticators, Gauges, Valves etc
iv.Installation, Testing and Pre Commissioning of DCS, SCADA, PLC etc
v.Laying,Termination, testing and Pre Commissioning of Instrument cables, FO cables, earthing cables , Heat Tracing system and Cathodic Protections System.
vi.Loop checking and preparation of loop check folder vii.Commissioning Assistance.
OMV Yemen 2009(on going)
ADCO ASAB Fullfield Development @ RDS - Abu Dhabi E&I Works
i.Installation,Testing and Pre Commissioning of LV switchgear,MV Switchgear, Transformers,UPS,Lighting Distribution Boards etc
ii.Laying,testing, Pre Commissioning and Termination of MV, LV , Control and Earthing cables.
iii.Installation, Testing and Pre Commissioning of Field instruments like Transmitters,Indicaticators, Gauges, Valves etc
iv.Installation, Testing and Pre Commissioning of DCS, SCADA, PLC etc
v.Laying,Termination, testing and Pre Commissioning of Instrument cables, FO cables and earthing cables
vi.Loop checking and preparation of loop check folder
Petrofac Abu Dhabi, UAE 2011-2014
ADCO ASAB Full field Development @ CDS E&I Works
i.Installation,Testing and Pre Commissioning of LV switchgear,MV Switchgear, Transformers,UPS,Lighting Distribution Boards etc
ii.Laying,testing, Pre Commissioning and Termination of MV, LV , Control and Earthing cables.
iii.Installation, Testing and Pre Commissioning of Field instruments like Transmitters,Indicaticators, Gauges, Valves etc
iv.Installation, Testing and Pre Commissioning of DCS, SCADA, PLC etc
v.Laying,Termination, testing and Pre Commissioning of Instrument cables, FO cables and earthing cables
vi.Loop checking and preparation of loop check folder
vii.Commissioning Assistance.
Tekfen Abu Dhabi, UAE 2012-2014
MEI Installation Works for ADMA-OPCO at ALSHAMKHA Site E&I Works
i.Installation of LV Switchgear
ii.Installation of power, control and Earthing cables.
iii. Installation cable Trays
iv.Fabrication and installation of cable Tray supports
v.Installation of Transmitters, Gauges, Valves, DCS, PLC etc.
vi.Installation of Piping and Piping structure
vii.Installation of Skids and Modules
viii.Installation of Mechanical Equipment.
Petrofac Abu Dhabi, UAE 2014-2015
ADCO ASAB Full field Development Shut Down Works E&I Works - RDS-6 Pre Shutdown works
i.Installation,Testing and Pre Commissioning of LV switchgear and DBs
ii.Laying,testing, Pre Commissioning and Termination of LV , Control and Earthing cables.
iii.Installation, Testing and Pre Commissioning of Field instruments like Transmitters,Indicaticators, Gauges, Valves etc
iv.Installation, Testing and Pre Commissioning of DCS, SCADA, PLC etc
v.Laying,Termination, testing and Pre Commissioning of Instrument cables, and earthing cables
vi.Loop checking and preparation of loop check folder vii.Commissioning Assistance.
Petrofac Abu Dhabi, UAE 2013-2014
GASCO, Ruwais 4th NGL Train Project E&I Works
i.Installation,Testing and Pre Commissioning of LV switchgear,MV Switchgear, Transformers,UPS,Lighting Distribution Boards etc
ii.Laying,testing, Pre Commissioning and Termination of MV, LV , Control and Earthing cables.
iii.Installation, Testing and Pre Commissioning of Field instruments like Transmitters,Indicaticators, Gauges, Valves etc
iv.Installation, Testing and Pre Commissioning of DCS, SCADA, PLC etc
v.Laying,Termination, testing and Pre Commissioning of Instrument cables, FO cables and earthing cables and heat tracing system.
vi.Loop checking and preparation of loop check folder
vii.Commissioning Assistance.
Petrofac Abu Dhabi, UAE 2012-2013
SHAH GAS Development (Package-2 &3) E&I Works
i.Installation of Lighting and Instrument cable Trays
ii.Fabrication and installation of cable Tray supports(Package-2 &3)
DODSAL Abu Dhabi, UAE 2013-2014
DNO Fish Khabour Commissioning &Startup Assistance for instrumentation works ZOZIK Iraq 2011
ENOC - Dubai Drafting Service ENOC Dubai, UAE 2011 - 2015
ADCO - Asab Full Field Development Projects E & I Works Subcontract Petrofac Abu Dhabi 2011 (on-going)
DNO Kurdistan Instrument Commissioning and Assistance Zozik Iraq 2011
ENOC Supply of Specialist Manpower ENOC UAE 2011 (on-going)
Survey and Soil Investigation Topographical Report - West Qurna Oilfield Kentz Iraq on-going
Al Uqlah Oil CPF Construction Construction of 30,000 Barrel Central Processing Facility (CPF) for OMV Kentz Yemen on-going